PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing steel angles for metal decking at Elev. 1,2,3 3rd Floor Facing West (800x600).jpg Laying out the foundation walls at column line 6.5 From G-C.7 Facing East (800x600).jpg Laying out the foundation walls at column line 6.5 From G-C.7 Facing South (800x600).jpg Metal Decking at Derrick -2 Facing North  (800x600).jpg Welding Derrick -1 Facing South-West (800x600).jpg
Previous page Welding Derrick -1 Facing South-West (800x600)
Welding Derrick -1 Facing South-West (800x600)